Berry bpi, Ardeer lighting energy saving project with 75% energy and 740 tonnes CO2 saved
Berry bpi, part of Berry Global Inc a huge plastic packaging, injection moulding and films company, has a plastic sheeting production facility in Ardeer on the Firth of Clyde, SW Scotland. It is an integrated set of some 10 acres of buildings on a site around 16 acres.
Hydro Aluminium Extrusions lighting energy saving project with 72% energy and 1067 tonnes CO2 saved.
Hydro Aluminium is a division of Norsk Hydro of Norway. Vita Energia secured a multi site contract to upgrade their production area lighting to LED. The sites have a mixed range of buildings: production areas running 24/7 and warehousing, stores and associated production offices.
RPC M&H Plastics, Ellough lighting energy saving project with 74% energy and 690 tonnes CO2 saved.
RPC M&H Plastics, has two sites near Beccles / Lowestoft, East Anglia. The site in Ellough has a mixed range of buildings: production halls running 24/7 to 9 m high and warehousing, stores and associated production offices. The lighting was a mixture of mainly metal halide, sodium and T8 fluorescent fittings.
Superglass, Stirling lighting energy saving project with 83% energy and 841 tonnes CO2 saved
Superglass is the largest independent glass insulation factory in the UK. The site has a mixed range of buildings: production areas running 24/7 and warehousing, stores and associated production offices. The lighting was a mixture of old sodium lamps in the warehouse areas and T8 fluorescent fittings in production areas.
M&H Llantrisant, Wales lighting energy saving project with 50% energy and 27 tonnes CO2 saved
M&H, part of Berry Global Inc a huge company specialise in production and decoration of high-quality plastic bottles, jars, flexible tubes, and closures. Berry M&H has one of the production facilities in Llantrisant, Wales. Initially Vita Energia upgraded warehouse 250W...
RPC M&H Plastics lighting energy saving project with 76% energy and 990 tonnes CO2 saved.
RPC M&H Plastics, has two sites near Beccles / Lowestoft, East Anglia. The site on London Road has over 30 very similarly constructed buildings: production halls running 24/7 and warehousing to 6 m high, stores and associated production offices. The lighting was a mixture of mainly metal halide, sodium and T8 fluorescent fittings.
Arla Foods saves 700 tonnes of CO2 annually with Vita Energia lighting
Arla Foods, one of Europe's largest dairy companies, has implemented lighting energy efficiency projects at its Oakthorpe and Hatfield sites in the UK. The projects, completed over 18 months, included converting almost all of the light fittings at both sites with Vita’s technology for saving energy. It also improved the quality of light in many areas.
Tarkett Marley Flooring lighting efficiency project forecasts saving 65% energy
Founded in 1886 Tarkett is a worldwide leader in the flooring industry. Tarkett works with many of the world’s leading architects and building professionals to provide a genuine service. Tarkett’s integrated flooring and sports surfaces solutions are part of numerous prestigious architectural references.
Scania dealer saves 4 tonnes of C02 annually with Vita Energia project
As part of a global corporate environmental policy, TruckEast, the main dealer of prestigious Scania trucks in SE England, sets and pursues annual green targets, aiming to reduce energy bills and carbon emissions.
Aliaxis lighting energy saving project with 67% energy saving and 682 tonnes CO2 saved
Aliaxis has a large site in the south east of England extruding and forming a wide range of Plastic pipes. The site has quite a mix of buildings: large production halls to 9 m high with a lot of daylight saving opportunity; open and narrow aisled storage to 6 and 8m high, associated production offices; canteen and washroom facilities and large areas of external storage yards.